Oklahoma River Rafting Center

In its “before” condition, 8,000,000 gallons of water in circulation were subject to fine clay and dust in Oklahoma City beside the Oklahoma river.

before
after

To achieve the desired result, Water Tech Solutions installed 1600 GPM polishing filtration using AFM glass, and upgraded the ozone injection station. In addition, we provided real-time water quality monitoring of pH, conductivity, ORP, flow rates, free chlorine and turbidity, (pre and post filtration).

Inland Salmon Farm, Florida

Water Tech Solutions was commissioned to install almost 1,000 pounds of ozone per day into two insulated Iso containers on their property.

before
after

We provided a climate controlled environment and monitored temperature, humidity, oxygen and ambient ozone conditions. Ozone gas was also distributed to 7 different locations across a 9-acre building. Included in our action plan was remote PLC real time monitoring of all ozone generator output performance parameters, and operation.

Contact Our Staff

For further information on engaging Water Tech Solutions as your water quality treatment experts, we encourage you to contact us today.